Representative 345 kV class transformer package as two tanks in an interconnect package yard
Representative class photos. Serial-unit records are captured on the order evidence pack.

Package

Interconnect LPT dual-unit package

2 x 250-300 MVA · 345 / 34.5 / 138 kV · 60 Hz

About this listing

  • 2 x 250-300 MVA, 345 / 34.5 / 138 kV, ONAF cooling.
  • Ship-to US. Permit corridor. FAT and verified receive available on the quotation.
  • Working-capital interest can be flagged on the quotation. Partner-indicated, subject to underwriting. No live APR.
  • Compliance targets: IEEE C57, IEC, BABA interest, Interconnect ready, ISO 9001, UL.

Specifications

Catalog No.SY-PKG-LPT-DUAL
MVA2 x 250-300 MVAVerify at quotation
Primary / secondary345 / 34.5 / 138 kVVerify at quotation
Frequency60 Hz
CoolingONAFVerify at quotationONAN/ODAF per OEM.
Vector groupOEM to proposeVerify at quotationYNd / Dyn common.
OLTCYesVerify at quotationTap range.
BIL1050 kV classVerify at quotationInferred from primary kV per IEEE/IEC.
%ZIndicative 8-12% Z matched band across 2x units for N+1 / dual-feed; confirm before dual-OEM awardVerify at quotation
StandardsIEEE C57; IEC 60076 as dual-path option
Lead time26-40 weeks AROVerify at quotationTarget, subject to confirmation.
Ship-toUS
HaulPermit corridor
Campus fitInterconnect, generic class

Rows marked Verify at quotation are quoted from class data and locked on the formal quotation, never assumed from this page.

Deep specs

  • Impedance: Indicative 8-12% Z matched band across 2x units for N+1 / dual-feed; confirm before dual-OEM award
  • BIL: Indicative 345 kV HV BIL + MV (34.5 or 138 kV) per one-line - confirm per RFQ
  • Cooling: ONAF matched stages across dual units preferred. Confirm ODAF if EHV adjacent.
  • Standards: IEEE C57 + IEC 60076. Package docs include dual-source switch CO playbook when pursue path changes.
  • Bushings: Package requires bushing BOM parity plan across dual units. HV bushing LT co-gate risk on 345 kV class.
  • FAT: Indicative - sequential or paired FAT; each unit closes its own fat_passed. Package critical path = slower unit.

Full spec page

Delivery and compliance

  • IEEE C57
  • IEC
  • BABA interest
  • Interconnect ready
  • ISO 9001
  • UL

Compliance targets for the quotation. Exact standard parts are confirmed on the RFQ; badges are never presented as live factory certificates.

Order evidence spine

Every award closes these gates in sequence. The same spine appears on your quotation receipt and drives any financing review.

  1. Entity freezeBuyer-of-record / constructing taxpayer locked for any financing review.
  2. Slot confirmSupplier-stated production window, once evidence closes.
  3. FAT passedFactory acceptance test witnessed or document-reviewed.
  4. Serial recordedNameplate / serial captured against the PO line.
  5. ShippedUnit cleared the plant or port. Heavy-haul plan attached.
  6. Verified receiveSite receipt, condition, and serial check.
  7. Invoice approvedBuyer/EPC approved the OEM invoice (progress-pay path).

Related listings

Representative transformer package in a campus package yard at dusk

Package

TF + HV breaker co-sell package

  • TF class per RFQ + companion HV breaker
  • per RFQ
  • ONAF · OLTC
  • BIL confirm
28-44 wk AROShips USPad delivery

Request pricing

Quoted on request. Ratings verified at quotation.

Request quotation

Catalog No. SY-PKG-TF-BREAKER

Request quotation