Supplies · HV interconnect
Site energization, not a GPU aisle
Energizing a North America campus is a transformer-and-yard problem before it is an IT problem. This surface covers the electrical package that lets the site take utility power or export BTM generation: interconnect LPTs, GSU adjacency, and the haul / FAT / receive loop.
Breaker, GIS, and protection packages can ride as notes on the RFQ. They are not GPU SKUs and they are not a second marketplace.