Class plate illustration: HV condenser bushing silhouette with sheds and mounting flange
Class plate illustration. No photography exists for this class; serial-unit records are captured on the order evidence pack.

Transformer spares

MPT critical spares kit: bushing set, OLTC contacts, gaskets, monitoring (configured and quoted on request)

Matched to listed MPT classes · 115-245 kV hosts · 60 Hz

About this listing

  • Matched to listed MPT classes, 115-245 kV hosts. Reference class, quoted on request; no OEM slot, approved-vendor, or inventory claim.
  • Ship-to US, Canada. Crated freight. FAT and verified receive available on the quotation.
  • Working-capital interest can be flagged on the quotation. Partner-indicated, subject to underwriting. No live APR.
  • Compliance targets: IEEE C57.19 / IEC 60214, IEC, ISO 9001.

Specifications

Catalog No.SY-SPARES-KIT-MPT
Kit scopeBushing set, OLTC contacts, gaskets, monitoringVerify at quotationConfigured per host MPT class. Scope confirm per RFQ.
Host classes115-245 kV MPT classes in the Switchyard Supply catalog
FitsEvery campus buying from the current transformer catalogVerify at quotationFit verify per host drawing.
Frequency60 Hz
StandardsIEEE C57.19 bushing family; IEC 60214 OLTC parts
Lead time12-30 weeks AROVerify at quotationTarget, subject to confirmation.
Ship-toUS, Canada
HaulCrated freight
Campus fitEvery campus buying from the current catalog

Rows marked Verify at quotation are quoted from class data and locked on the formal quotation, never assumed from this page.

Delivery and compliance

  • IEEE C57.19 / IEC 60214
  • IEC
  • ISO 9001

Compliance targets for the quotation. Exact standard parts are confirmed on the RFQ; badges are never presented as live factory certificates.

Order evidence spine

Every award closes these gates in sequence. The same spine appears on your quotation receipt and drives any financing review.

  1. Entity freezeBuyer-of-record / constructing taxpayer locked for any financing review.
  2. Slot confirmSupplier-stated production window, once evidence closes.
  3. FAT passedFactory acceptance test witnessed or document-reviewed.
  4. Serial recordedNameplate / serial captured against the PO line.
  5. ShippedUnit cleared the plant or port. Heavy-haul plan attached.
  6. Verified receiveSite receipt, condition, and serial check.
  7. Invoice approvedBuyer/EPC approved the OEM invoice (progress-pay path).

Related listings

Request quotation