Representative 345 kV class large power transformer in a western desert switchyard
Representative class photos. Serial-unit records are captured on the order evidence pack.

LPT

Interconnect LPT 320 MVA 345/115 kV

320 MVA · 345 / 115 kV · 60 Hz

About this listing

  • 320 MVA, 345 / 115 kV, ONAF/ODAF cooling.
  • Ship-to Canada. Permit corridor. FAT and verified receive available on the quotation.
  • Working-capital interest can be flagged on the quotation. Partner-indicated, subject to underwriting. No live APR.
  • Compliance targets: IEEE C57, IEC, BABA interest, Interconnect ready, ISO 9001, UL.

Specifications

Catalog No.SY-LPT-320-345-115
MVA320 MVAVerify at quotationCooling stage sets the usable rating.
Primary / secondary345 / 115 kV
Frequency60 Hz
CoolingONAF/ODAF
Vector groupOEM to proposeVerify at quotationYNd / Dyn common.
OLTCYesVerify at quotationTap range.
BIL1050 kV
%ZPer quotationVerify at quotation%Z band.
StandardsIEEE C57; IEC 60076 as dual-path option
Lead time28-44 weeks AROVerify at quotationTarget, subject to confirmation.
Ship-toCanada
HaulPermit corridor
Campus fitInterconnect, generic class

Rows marked Verify at quotation are quoted from class data and locked on the formal quotation, never assumed from this page.

Delivery and compliance

  • IEEE C57
  • IEC
  • BABA interest
  • Interconnect ready
  • ISO 9001
  • UL

Compliance targets for the quotation. Exact standard parts are confirmed on the RFQ; badges are never presented as live factory certificates.

Order evidence spine

Every award closes these gates in sequence. The same spine appears on your quotation receipt and drives any financing review.

  1. Entity freezeBuyer-of-record / constructing taxpayer locked for any financing review.
  2. Slot confirmSupplier-stated production window, once evidence closes.
  3. FAT passedFactory acceptance test witnessed or document-reviewed.
  4. Serial recordedNameplate / serial captured against the PO line.
  5. ShippedUnit cleared the plant or port. Heavy-haul plan attached.
  6. Verified receiveSite receipt, condition, and serial check.
  7. Invoice approvedBuyer/EPC approved the OEM invoice (progress-pay path).

Related listings

Request quotation